Skip to main content

[Ei] OS 3.10.0.p.8 for [Ei] Nodes Patch Released - News / General - Evogence Helpdesk

Jan 14 2018

[Ei] OS 3.10.0.p.8 for [Ei] Nodes Patch Released

Authors list

This news post provides version-specific information about the patch release of [Ei] OS 3.10.0.p.8 for [Ei] Nodes.

Resolved Issues

  • Resolved the issue with the playback restart after opening the Network Configuration form (by Right Shift) on the appliances with intermittent Internet connection.
  • Resolved the issue with the incorrect period for log retention on appliances with [Ei] OS Interactive Edition.
  • Resolved the issue with display of the second PiP frame of the Feed app during its exposure in Control Panel app.
  • Resolved the issue witt display of the PiP frame when using it with Overlay 3/4 layout.
  • Resolved the issue with the insufficient troubleshooting logs on [Ei] Node which were cleaned every 7 days due to the incorrect settings.
  • Resolved the issue with delivery of the Schedule Settings Synchronization task from [Ei] Central to [Ei] Node.
  • Resolved the issue with saving the network configuration by pressing the F6 button.
  • Resolved the issue with verification of connection to [Ei] Support Server when pressing the F7 button.
  • Resolved the issue with showing not supported interfaces in the Network Configuration form on different [Ei] Node models.
  • Resolved the issue with delivery of two Active Schemas from [Ei] Central and their usage on [Ei] Nodes.
  • Resolved the issue with delivery of the sequence containing a video file with the name having an apostrophe.
  • Resolved the markup issue with showing the Wi-Fi section in the Network Configuration form.
  • Resolved the issue with unavailability of the LAN section after enabling the Wi-Fi connectivity.
  • Resolved the issue with automatic setup of DNS settings with the enabled Obtain IP address automatically option.
  • Resolved the issue with delivery of playback schedules containing schedules with minutes.
  • Resolved the issue with delivery of the monthly active schema from [Ei] Central to [Ei] Node when running the Broacast Schedule Delivery task.
  • Resolved the issue with 2 to 10 minutes delay when starting playback of Active Schema on [Ei] Node.
Helpful Unhelpful

4 of 7 people found this page helpful

Add a comment

Please log in or register to submit a comment.

Need a password reminder?